Service Navigation

Passive Liquidity Protection: pilot phase and setup information

Release date: 08 Mar 2019 | Eurex Exchange

No. 027/2019 Passive Liquidity Protection: pilot phase and setup information

With this circular, we would like to inform you about the upcoming pilot phase of the Passive Liquidity Protection (PLP) which will start on
3 June 2019.

In this pilot phase, PLP will be activated for all German and French equity options (Group IDs DE/FR11, DE/FR12, DE/FR13, DE/FR14) traded in the Eurex T7 system. The deferral times for the German and French segment will be set in accordance with the respective latency characteristics of each segment.

PLP will be available in the Eurex simulation for the same product segments with production-like deferral time starting 8 March 2019.

Further information